![]() ![]() The Minister and Kerala officers were present. “Accordingly, the gates were opened on October 29, at 7.29 am. ![]() Accordingly, an intimation was given on October 27 at 6 pm to Kerala and others stating that the water level in the dam was increasing. Therefore, to follow the directive of the SC dated October 28, the water above the Rule level has to be necessarily released,” Durai Murugan added.įurther clarifying the issue, the Minister said advance information had to be given to the officers of Kerala before opening the Mullaiperiyar dam as per the SOP. Thus, the excess had to be released through the spillway after the due advance intimation. “This increase was after drawing maximum water to Vaigai through the Tunnel. ![]() The Minister pointed out that from the afternoon of October 27, the water level was raising and on the morning of October 28, the water level was 138.05 ft, and on October, the water level went up to 138.75 ft while the permitted Rule level for the corresponding period was 138 ft. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
January 2023
Categories |